Great to see a concrete path topped off with some grey stock dust being installed by Lakeland this week. 


The concrete was allowed to start drying before quickly being topped up with some stock dust and screeded so that the pathway will be have a permanent surface.


Although work continues with this path area, it looks fantastic so far and with the laid turf having been rolled too, this whole area is really starting to take shape. 

The general consensus amongst the members that I have talked to regarding the work has been unequivocally positive.

I will update the blog next week with some more photos. Have a great weekend and enjoy your golf!